
Stewardship is non-negotiable.
Vapor recovery, foam suppression, secondary containment, OPA-90 spill response readiness and an OSHA Process Safety Management program operated continuously by a trained 24/7 workforce.
Every standard. Every audit.
Jacintoport operates within an overlapping regulatory framework spanning federal, state and industry standards — engineered for institutional liquid bulk operations.

Vapor recovery. 99.5% DRE.
Second-generation vapor recovery units (VRUs) integrate the marine manifold, truck rack and tank vents under a single recovery loop. Destruction and removal efficiency is held above 99.5% — well within MTSA limits — and reported continuously.
- Marine manifold VRU
- Truck rack VRU
- Internal floating roof tanks
- Fugitive emission monitoring (Method 21)
- TCEQ Title V air permit
- Continuous DRE reporting
Foam-suppressed. Continuously drilled.
Each tank pad is served by a dedicated foam suppression header and remote-operated monitors with redundant firewater supply, jockey pumps and main diesel-driven pumps. Crews drill monthly with mutual-aid coordination across the Channelview industrial district.
- NFPA 11 / 25 compliant
- Diesel-driven firewater pumps
- Foam concentrate inventory on-site
- Remote-operated tank monitors
- Mutual-aid agreements
- Monthly response drills


OPA-90 ready. USCG-coordinated.
A full Facility Response Plan filed with USCG covers worst-case discharge scenarios, with pre-staged boom inventory, OSRO contractor coverage, and continuous coordination with the Houston-Galveston Area Committee.
- OPA-90 Facility Response Plan
- USCG-approved OSRO contractor
- Pre-staged boom & skimmers
- NRC notification protocols
- Marine pollution mutual-aid
- Quarterly response exercises
OSHA PSM. RMP program. Continuously audited.
Workforce Safety
OSHA PSM, RMP program, behavior-based safety, monthly safety stand-downs, contractor pre-qualification under ISNetworld and Avetta.
Environmental Permitting
TCEQ Title V air, TPDES storm water, Tier II SARA reporting, Spill Prevention Control and Countermeasure (SPCC) plan.
Mechanical Integrity
API 510, 570, 653 inspection cadence, corrosion modeling, leak detection, valve testing and PRD inspection programs.
Water Stewardship
API oil-water separators, continuous discharge monitoring, storm-water retention and TCEQ-permitted discharge points.
Greenhouse Gas Accounting
Mandatory GHG Reporting Rule (MRR) participation with annual third-party verification and reduction roadmap.
Community Engagement
Channelview Community Advisory Panel participation, transparent stewardship reporting and emergency notification ties.
Put Houston's deepwater liquid bulk gateway to work for your supply chain.
Spot, term and tolling structures across crude, refined products, fuel oil, biofuels and renewable feedstocks. Receive a same-day capability brief, indicative rate sheet and berth availability window.
